showing 12 of 13 Results
Electrical Design and Shop Drawing
1-Design and make shop drawing For all electrical systems (Power-Lighting-Cable Route-Light Current Systems -Earthing-Lightning) 2-Model all electrical Systems using Revit and Navisworks
Automation Engineer PLC & INVERTER
control system design, industrial communication, Power electronics, and VSD, Electrical machine control S7-300, WINCC, Troubleshooting and commissioning, MCC, consultations
Standard Power Factor Panel
power factor panel (building, maintenance and installing) according to IEC
DRAFTING
Shop Drawing Works
Uninterruptible Power Supply (UPS) , Stabilizer
Uninterruptible Power Supply (UPS) (SOCOMEC, BORRI and RIELLO Stabilizer and Fire Alarm System (FAS)
L.V. small Circuits Test Engineer
L.V. small Circuits Test Engineer Responsible for applying  L.V. small Circuits Test notice that :_ This Test is divided to three tests  :               1. Continuity Test Conductive ( PCC ) •It is the check
Lighting Illumination Level Measurement Engineer
Lighting Illumination Level Measurement Engineer Responsible for Lighting Illumination Level  measurement using Lux Meter notice that :_ For emergency Illumination level (Shall be not less than an average 10.8 Lux) (Ref. To NFPA101, Life Safety Code). For normal lighting system
Oil Break Down Voltage Test Engineer
Oil Break Down Voltage Test Engineer   Responsible for applying Oil Break Down Voltage Test (For Oil Transformers) notice that :_ Breakdown voltage is known by the Dielectric strength of transformer oil. Break down voltage is measured by observing at what voltage, sparking straits
Hi- Potential Test Engineer
Hi- Potential Test  Engineer Responsible for applying Hi- Potential Test (also called Dielectric Withstanding Voltage (DWV) test) notice that :_ The Hipot test (also called Dielectric Withstanding Voltage (DWV) test) verifies that the insulation in finished appliances, cables and
Thermography Survey Engineer
Thermography  Survey  Engineer   Responsible for Thermal Imaging Identifying The Following: Weak Connections Overloaded Cables Thermal Losses    
Insulation Resistance Test Engineer
 Insulation Resistance Test Engineer Responsible for:_    Check The Insulation Level for cables ,  Transformers windings & Bus ways.  Check Polarization Index & Dielectric Absorption Ratio
Earthing System Testing Engineer
Earthing System Testing  Engineer Responsible for  check the Earthing system resistance.  applying online or offline measurement
showing 12 of 13 Results